Withdrawing my question above: Spencer reads "good as shown" as keeping every row, the Shipping filing row included. Recorded in docs/PLAN.md and docs/POLICY.md (PR 51). Closing.
Kept as built and recorded in docs/PLAN.md (PR 51). Nothing changes in the build. Closing.
Kept as built and recorded in docs/PLAN.md (PR 51). Nothing changes in the build. Closing.
Kept as built and recorded in docs/PLAN.md (PR 51). Nothing changes in the build. Closing.
Kept as built and recorded in docs/PLAN.md (PR 51). Nothing changes in the build. Closing.
Kept as built and recorded in docs/PLAN.md (PR 51). Nothing changes in the build. Closing.
Kept as built and recorded in docs/PLAN.md (PR 51). Nothing changes in the build. Closing.
Kept as built and recorded in docs/PLAN.md (PR 51). Nothing changes in the build. Closing.
Kept as built and recorded in docs/PLAN.md (PR 51). Nothing changes in the build. Closing.
Thanks. Everything is recorded as kept, with one row left to confirm.
The checklist has two rows unticked. The warehouse release gate is settled by your answer on issue 16 (keep it). The other…