The old "copy marks to the new sheet" button on a change order #22

Closed
opened 2026-10-19 02:50:18 +00:00 by spencerm · 2 comments
Owner

On a page replacement only the heat table placement is copied to the new page; welds and heat tags stay on the VOID page.

Built as the default: the manual copy button is not ported.

To answer: whether the shop wants it back.


Plan reference: Q25 in docs/PLAN.md (open questions). Answer here; the build takes the default until then.

On a page replacement only the heat table placement is copied to the new page; welds and heat tags stay on the VOID page. **Built as the default:** the manual copy button is not ported. **To answer:** whether the shop wants it back. --- Plan reference: Q25 in [docs/PLAN.md](https://gt.pescoinc.biz/spencerm/PacketStation/src/branch/main/docs/PLAN.md) (open questions). Answer here; the build takes the default until then.
spencerm added the phase 5decision: Seth labels 2026-10-19 02:50:18 +00:00
SethD was assigned by spencerm 2026-10-19 02:50:53 +00:00
Collaborator

Yes leave as is. if there is a change order, the work must be re verified through the department. There will be situations where the change order may drastically change something that can't just be copied over

Yes leave as is. if there is a change order, the work must be re verified through the department. There will be situations where the change order may drastically change something that can't just be copied over
Author
Owner

Kept as built and recorded in docs/PLAN.md (PR 51). Nothing changes in the build. Closing.

Kept as built and recorded in docs/PLAN.md (PR 51). Nothing changes in the build. Closing.