Commit Graph
2 Commits
Author SHA1 Message Date
spencermandClaude Opus 5.5 a82e056b6a Phase 9: Admin completion, reconcile, notifications, integrity, backups
ci / frontend (pull_request) Successful in 1m11s
ci / server (pull_request) Successful in 12m2s
ci / image (pull_request) Skipped
ci / e2e (pull_request) Successful in 6m1s
Admin: Departments (name and stations; add shows the three groups IT must
create), Profiles (welder stamp, station limits, active) with a CSV import
that previews and applies only when clean, Checklists (weld and plain),
Security (session, lockout and rate-limit settings with bounds, alerts for
the last 24 hours, the integrity result), Access log with filters and a
guarded CSV, Who is in, Stamp check, Notifications, and the employeeID
flags. Every Admin change is audited.

Worker: ad-reconcile (nightly and on "refresh from AD now"), session-refresh
(15 minutes), integrity (seals, asset hashes, missing and orphan files, the
audit chain), backup-check, notify-send and notify-digest. Notifications
route per event type to AD groups, users, mailboxes or the department
Supervisor group, immediately or in a daily digest, over STARTTLS verified
against the PESCO CA, with dry run on the test stack.

Backups: scripts/backup/ps-backup.sh and ps-restore.sh with a systemd timer
at 02:00 America/Denver. Restore rehearsed on the test stack 2026-10-21.
CI: pip-audit and npm audit. pypdf 6.21.1 and certifi 2026.10.19.

Migration 0010. Closes the app part of I6, M3, O1, O2 and S3.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-10-21 18:27:09 -06:00
spencermandClaude Fable 5.1 6b6db0230f Phase 8: Project Management, find bar, presence and motion
ci / frontend (push) Successful in 43s
ci / server (push) Successful in 11m6s
ci / image (push) Successful in 38s
ci / e2e (push) Successful in 3m55s
The Project Management screen (/pm, view only) with Overview, Projects & units, Bottlenecks & aging, Hours vs target,
Quality & issues and Find jobs, the period picker, health per unit and per project, drill down, Excel (CSV) per table
and for all, and the PESCO production status report PDF with the controlled-copy stamp; every export logged as
"report exported". The find bar on every home screen: the full search set, the dropdowns, quick flags with Mine, the
flag kinds, Board and List with sorts, filters saved per browser; every filter applied by the server on the list and
the boards, with facets. Presence in packets with role, lock and revoke drop; the motion switch with reduced motion
honoured, card glides, glow and count-up; Back restores the scroll spot; sheet placement and the iPad layout pass. The
data book compared page by page with the old build and six layout differences fixed. Tests for the PM aggregates,
search, filters, presence and exports; Playwright scenarios for the PM screen, the find bar and presence at desktop and
iPad viewports. Docs updated; PLAN.md questions 38 to 42.

Co-Authored-By: Claude Fable 5.1 <[email protected]>
2026-10-18 15:08:34 -06:00