Commit Graph
4 Commits
Author SHA1 Message Date
spencermandClaude Opus 5.5 70a97398f1 Build Seth's changes C1 to C11 (Gitea issues 1, 8, 18, 23, 24, 25, 27, 31, 32, 33, 36)
ci / server (pull_request) Successful in 12m48s
ci / frontend (pull_request) Successful in 54s
ci / image (pull_request) Skipped
ci / e2e (pull_request) Successful in 4m38s
- C1 (issue 1): over target follows VISUAL ticket hours, not the timer.
- C2 (issue 24): a Q.C. reject always needs a reason; accept needs an NCR number after a reject without one.
- C3 (issue 25): an incomplete unit ITP blocks filing.
- C4 (issue 27): prints open the print dialog on the page, no new tab.
- C5 (issue 31): filing is blocked while VISUAL shows a work order open; the feed sets vclosed on VISUAL packets.
- C6 (issue 8): the data book leaves out the history pages.
- C7 (issue 18): the supervisor approves each received short; accept and filing wait for it.
- C8 (issue 23): per-department checklists, edited by the department supervisor or Admin, frozen at START.
- C9 (issue 32): Q.C. and Clerical may run the stamp check.
- C10 (issue 33): the PM screen and reports are for PS-ProjectMgmt and Admin only.
- C11 (issue 36): the Stall screen lists the packets assigned to the welder, at the supervisor's stall.

Migration 0011. Docs: PLAN (also issue 9 confirmed, issue 4 asked), POLICY, SECURITY, SCHEMA, FEED, README, CHANGELOG.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-10-30 16:36:49 -06:00
spencermandClaude Opus 5.5 a82e056b6a Phase 9: Admin completion, reconcile, notifications, integrity, backups
ci / frontend (pull_request) Successful in 1m11s
ci / server (pull_request) Successful in 12m2s
ci / image (pull_request) Skipped
ci / e2e (pull_request) Successful in 6m1s
Admin: Departments (name and stations; add shows the three groups IT must
create), Profiles (welder stamp, station limits, active) with a CSV import
that previews and applies only when clean, Checklists (weld and plain),
Security (session, lockout and rate-limit settings with bounds, alerts for
the last 24 hours, the integrity result), Access log with filters and a
guarded CSV, Who is in, Stamp check, Notifications, and the employeeID
flags. Every Admin change is audited.

Worker: ad-reconcile (nightly and on "refresh from AD now"), session-refresh
(15 minutes), integrity (seals, asset hashes, missing and orphan files, the
audit chain), backup-check, notify-send and notify-digest. Notifications
route per event type to AD groups, users, mailboxes or the department
Supervisor group, immediately or in a daily digest, over STARTTLS verified
against the PESCO CA, with dry run on the test stack.

Backups: scripts/backup/ps-backup.sh and ps-restore.sh with a systemd timer
at 02:00 America/Denver. Restore rehearsed on the test stack 2026-10-21.
CI: pip-audit and npm audit. pypdf 6.21.1 and certifi 2026.10.19.

Migration 0010. Closes the app part of I6, M3, O1, O2 and S3.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-10-21 18:27:09 -06:00
spencermandClaude Fable 5.1 6b6db0230f Phase 8: Project Management, find bar, presence and motion
ci / frontend (push) Successful in 43s
ci / server (push) Successful in 11m6s
ci / image (push) Successful in 38s
ci / e2e (push) Successful in 3m55s
The Project Management screen (/pm, view only) with Overview, Projects & units, Bottlenecks & aging, Hours vs target,
Quality & issues and Find jobs, the period picker, health per unit and per project, drill down, Excel (CSV) per table
and for all, and the PESCO production status report PDF with the controlled-copy stamp; every export logged as
"report exported". The find bar on every home screen: the full search set, the dropdowns, quick flags with Mine, the
flag kinds, Board and List with sorts, filters saved per browser; every filter applied by the server on the list and
the boards, with facets. Presence in packets with role, lock and revoke drop; the motion switch with reduced motion
honoured, card glides, glow and count-up; Back restores the scroll spot; sheet placement and the iPad layout pass. The
data book compared page by page with the old build and six layout differences fixed. Tests for the PM aggregates,
search, filters, presence and exports; Playwright scenarios for the PM screen, the find bar and presence at desktop and
iPad viewports. Docs updated; PLAN.md questions 38 to 42.

Co-Authored-By: Claude Fable 5.1 <[email protected]>
2026-10-18 15:08:34 -06:00
spencermandClaude Fable 5.1 5a4174e0c2 Phase 5: Supervisor and Stall screens, weld map, heat table, clock and CO verification
ci / frontend (push) Successful in 34s
ci / server (push) Successful in 7m15s
ci / image (push) Successful in 39s
ci / e2e (push) Successful in 2m4s
The shop at parity with the old build. Supervisor screen (department chips, CO headline, numbers, Change orders
on hold, station grid with clocks and CO tags, boards) and Stall screen (station picker, hero, My packets,
Submitted). Shop steps on the packet page: assign with station, welder picker and stamp; pull back; Start, Pause,
Resume; Submit with a PIN signature and the missing steps as links; review with Send to Q.C., Return to station
and Skip Q.C. route; a lead's read-only review. Weld map (pdf.js viewer with pan, pinch, zoom, full screen; marks
with leader lines; weld sheet; weld record with field CAS; carried marks). Heat map (heat table placed, dragged,
sized, removed; legacy amber tags; borrowed heat map read-only). Checklist tab with templates from settings.
VOID stamps on voided pages. Change orders: CO-n labels, supervisor verify with signature, approval copies the
heat table to the new sheet and the BOM merge keeps the shop's values. Server clock of record with VISUAL ticket
hours beside it. Presence per packet over SSE. Migration 0006 (bfx, bfy, carried_from, checklist_templates).
New endpoints /api/shop/board, /api/shop/stations, /api/shop/stall, /api/departments/{code}/people.

Tests: policy oracle for every shop action, role and status; clock arithmetic; concurrent inserts; CO apply;
frontend geometry, heat table, clock, checklist, weld sheet, screens; seven Playwright scenarios. Docs updated.

Co-Authored-By: Claude Fable 5.1 <[email protected]>
2026-10-16 22:46:56 -06:00