- C1 (issue 1): over target follows VISUAL ticket hours, not the timer.
- C2 (issue 24): a Q.C. reject always needs a reason; accept needs an NCR number after a reject without one.
- C3 (issue 25): an incomplete unit ITP blocks filing.
- C4 (issue 27): prints open the print dialog on the page, no new tab.
- C5 (issue 31): filing is blocked while VISUAL shows a work order open; the feed sets vclosed on VISUAL packets.
- C6 (issue 8): the data book leaves out the history pages.
- C7 (issue 18): the supervisor approves each received short; accept and filing wait for it.
- C8 (issue 23): per-department checklists, edited by the department supervisor or Admin, frozen at START.
- C9 (issue 32): Q.C. and Clerical may run the stamp check.
- C10 (issue 33): the PM screen and reports are for PS-ProjectMgmt and Admin only.
- C11 (issue 36): the Stall screen lists the packets assigned to the welder, at the supervisor's stall.
Migration 0011. Docs: PLAN (also issue 9 confirmed, issue 4 asked), POLICY, SECURITY, SCHEMA, FEED, README, CHANGELOG.
Co-Authored-By: Claude Opus 5.5 <[email protected]>
- Traveler: each work-order line shrinks, then clips, to fit its own box; 18 pt gap between boxes
- Work orders tab: card text wraps inside the card, smaller work order, wider cards
- Packet tabs: Materials before Heat map
- Sessions: SESSION_DESK_MINUTES (60) for Admin and Clerical lock and sign-out; /me answers
lock_minutes and the browser's idle lock follows it
Co-Authored-By: Claude Opus 5.5 <[email protected]>
The Project Management screen (/pm, view only) with Overview, Projects & units, Bottlenecks & aging, Hours vs target,
Quality & issues and Find jobs, the period picker, health per unit and per project, drill down, Excel (CSV) per table
and for all, and the PESCO production status report PDF with the controlled-copy stamp; every export logged as
"report exported". The find bar on every home screen: the full search set, the dropdowns, quick flags with Mine, the
flag kinds, Board and List with sorts, filters saved per browser; every filter applied by the server on the list and
the boards, with facets. Presence in packets with role, lock and revoke drop; the motion switch with reduced motion
honoured, card glides, glow and count-up; Back restores the scroll spot; sheet placement and the iPad layout pass. The
data book compared page by page with the old build and six layout differences fixed. Tests for the PM aggregates,
search, filters, presence and exports; Playwright scenarios for the PM screen, the find bar and presence at desktop and
iPad viewports. Docs updated; PLAN.md questions 38 to 42.
Co-Authored-By: Claude Fable 5.1 <[email protected]>
Clerical close and file: the VISUAL observed state beside the close confirm, a 409 with a second confirm when the
feed still shows work orders open, filing with a signature and the HMAC seal, the data book built on the server
and stored on the seal in the filing transaction, admin reopen keeping the broken seal with its data book.
Server PDFs with reportlab, pypdf and pypdfium2: the manufacturing data book page for page after the old build
(cover, index, drawings with VOID stamps, traceability and heat map rasters, weld maps and welding records, Q.C.
inspections, Q.C. and test documents, MTRs, record history), the job traveler with work order QR codes, the ITP
PDF filed automatically at sign-off, every print kind with the PRINTED COPY stamp, the controlled-copy stamp
signed with the seal key, PDF metadata, the traceability CSV with the formula guard, and the append-only
print_log with an audit row for every print and export (migration 0008).
Frontend: the close and file panel, the print menu and its entry points, the printed copies list on the History
tab, the ITP PDF buttons. Tests: server (close, file, reopen, seal, the builders, prints, CSV, stamps), frontend,
and the Playwright close and print scenarios. Docs updated; SECURITY closes M2, S6, S7 and S8.
Co-Authored-By: Claude Fable 5.1 <[email protected]>
The Q.C. screen (KPIs, boards, project folders), the Q.C. tab on the packet
page (check items from the qc_check_items settings row, visual exam per weld,
NDE, hardness with the NACE label, notes), accept with a route and a
signature gated by qc_missing_empty, reject with a reason or an NCR number
closing the inspection into qc_history, Q.C. folder documents per project and
unit with superseding revisions, packet documents as a closed set with
take-out reasons, the digital ITP per unit from the frozen template (line
initials with CAS, unsign, N/A, customer codes, rejects with NCR, block
signatures, sign-off with the PDF hook, admin reopen, the ITP log), hold-point
warnings by department page group, the scoped policy check for unit and
project writes, migration 0007, tests, Playwright scenarios and docs.
Co-Authored-By: Claude Fable 5.1 <[email protected]>