spencermandClaude Opus 5.5 70a97398f1 Build Seth's changes C1 to C11 (Gitea issues 1, 8, 18, 23, 24, 25, 27, 31, 32, 33, 36)
ci / server (pull_request) Successful in 12m48s
ci / frontend (pull_request) Successful in 54s
ci / image (pull_request) Skipped
ci / e2e (pull_request) Successful in 4m38s
- C1 (issue 1): over target follows VISUAL ticket hours, not the timer.
- C2 (issue 24): a Q.C. reject always needs a reason; accept needs an NCR number after a reject without one.
- C3 (issue 25): an incomplete unit ITP blocks filing.
- C4 (issue 27): prints open the print dialog on the page, no new tab.
- C5 (issue 31): filing is blocked while VISUAL shows a work order open; the feed sets vclosed on VISUAL packets.
- C6 (issue 8): the data book leaves out the history pages.
- C7 (issue 18): the supervisor approves each received short; accept and filing wait for it.
- C8 (issue 23): per-department checklists, edited by the department supervisor or Admin, frozen at START.
- C9 (issue 32): Q.C. and Clerical may run the stamp check.
- C10 (issue 33): the PM screen and reports are for PS-ProjectMgmt and Admin only.
- C11 (issue 36): the Stall screen lists the packets assigned to the welder, at the supervisor's stall.

Migration 0011. Docs: PLAN (also issue 9 confirmed, issue 4 asked), POLICY, SECURITY, SCHEMA, FEED, README, CHANGELOG.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-10-30 16:36:49 -06:00
spencermandClaude Fable 5.1 5a4174e0c2 Phase 5: Supervisor and Stall screens, weld map, heat table, clock and CO verification
ci / frontend (push) Successful in 34s
ci / server (push) Successful in 7m15s
ci / image (push) Successful in 39s
ci / e2e (push) Successful in 2m4s
The shop at parity with the old build. Supervisor screen (department chips, CO headline, numbers, Change orders
on hold, station grid with clocks and CO tags, boards) and Stall screen (station picker, hero, My packets,
Submitted). Shop steps on the packet page: assign with station, welder picker and stamp; pull back; Start, Pause,
Resume; Submit with a PIN signature and the missing steps as links; review with Send to Q.C., Return to station
and Skip Q.C. route; a lead's read-only review. Weld map (pdf.js viewer with pan, pinch, zoom, full screen; marks
with leader lines; weld sheet; weld record with field CAS; carried marks). Heat map (heat table placed, dragged,
sized, removed; legacy amber tags; borrowed heat map read-only). Checklist tab with templates from settings.
VOID stamps on voided pages. Change orders: CO-n labels, supervisor verify with signature, approval copies the
heat table to the new sheet and the BOM merge keeps the shop's values. Server clock of record with VISUAL ticket
hours beside it. Presence per packet over SSE. Migration 0006 (bfx, bfy, carried_from, checklist_templates).
New endpoints /api/shop/board, /api/shop/stations, /api/shop/stall, /api/departments/{code}/people.

Tests: policy oracle for every shop action, role and status; clock arithmetic; concurrent inserts; CO apply;
frontend geometry, heat table, clock, checklist, weld sheet, screens; seven Playwright scenarios. Docs updated.

Co-Authored-By: Claude Fable 5.1 <[email protected]>