Commit Graph
3 Commits
Author SHA1 Message Date
spencermandClaude Opus 5.5 a82e056b6a Phase 9: Admin completion, reconcile, notifications, integrity, backups
ci / frontend (pull_request) Successful in 1m11s
ci / server (pull_request) Successful in 12m2s
ci / image (pull_request) Skipped
ci / e2e (pull_request) Successful in 6m1s
Admin: Departments (name and stations; add shows the three groups IT must
create), Profiles (welder stamp, station limits, active) with a CSV import
that previews and applies only when clean, Checklists (weld and plain),
Security (session, lockout and rate-limit settings with bounds, alerts for
the last 24 hours, the integrity result), Access log with filters and a
guarded CSV, Who is in, Stamp check, Notifications, and the employeeID
flags. Every Admin change is audited.

Worker: ad-reconcile (nightly and on "refresh from AD now"), session-refresh
(15 minutes), integrity (seals, asset hashes, missing and orphan files, the
audit chain), backup-check, notify-send and notify-digest. Notifications
route per event type to AD groups, users, mailboxes or the department
Supervisor group, immediately or in a daily digest, over STARTTLS verified
against the PESCO CA, with dry run on the test stack.

Backups: scripts/backup/ps-backup.sh and ps-restore.sh with a systemd timer
at 02:00 America/Denver. Restore rehearsed on the test stack 2026-10-21.
CI: pip-audit and npm audit. pypdf 6.21.1 and certifi 2026.10.19.

Migration 0010. Closes the app part of I6, M3, O1, O2 and S3.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-10-21 18:27:09 -06:00
spencermandClaude Fable 5.1 904437153d Phase 7: close, file, PDFs and prints
ci / frontend (push) Successful in 40s
ci / server (push) Successful in 10m56s
ci / image (push) Successful in 48s
ci / e2e (push) Successful in 2m44s
Clerical close and file: the VISUAL observed state beside the close confirm, a 409 with a second confirm when the
feed still shows work orders open, filing with a signature and the HMAC seal, the data book built on the server
and stored on the seal in the filing transaction, admin reopen keeping the broken seal with its data book.

Server PDFs with reportlab, pypdf and pypdfium2: the manufacturing data book page for page after the old build
(cover, index, drawings with VOID stamps, traceability and heat map rasters, weld maps and welding records, Q.C.
inspections, Q.C. and test documents, MTRs, record history), the job traveler with work order QR codes, the ITP
PDF filed automatically at sign-off, every print kind with the PRINTED COPY stamp, the controlled-copy stamp
signed with the seal key, PDF metadata, the traceability CSV with the formula guard, and the append-only
print_log with an audit row for every print and export (migration 0008).

Frontend: the close and file panel, the print menu and its entry points, the printed copies list on the History
tab, the ITP PDF buttons. Tests: server (close, file, reopen, seal, the builders, prints, CSV, stamps), frontend,
and the Playwright close and print scenarios. Docs updated; SECURITY closes M2, S6, S7 and S8.

Co-Authored-By: Claude Fable 5.1 <[email protected]>
2026-10-17 23:49:14 -06:00
spencermandClaude Fable 5.1 00531cb329 Phase 6: Q.C. inspection, project folders, packet documents and the digital ITP
ci / frontend (push) Successful in 37s
ci / server (push) Successful in 9m18s
ci / image (push) Successful in 35s
ci / e2e (push) Successful in 2m17s
The Q.C. screen (KPIs, boards, project folders), the Q.C. tab on the packet
page (check items from the qc_check_items settings row, visual exam per weld,
NDE, hardness with the NACE label, notes), accept with a route and a
signature gated by qc_missing_empty, reject with a reason or an NCR number
closing the inspection into qc_history, Q.C. folder documents per project and
unit with superseding revisions, packet documents as a closed set with
take-out reasons, the digital ITP per unit from the frozen template (line
initials with CAS, unsign, N/A, customer codes, rejects with NCR, block
signatures, sign-off with the PDF hook, admin reopen, the ITP log), hold-point
warnings by department page group, the scoped policy check for unit and
project writes, migration 0007, tests, Playwright scenarios and docs.

Co-Authored-By: Claude Fable 5.1 <[email protected]>
2026-10-17 20:08:53 -06:00