2 Commits
Author SHA1 Message Date
spencermandClaude Opus 5.5 de5b361d85 Work-order codes no longer overlap (#42), Materials before Heat map (#44), 60 min idle for Admin and Clerical (#45)
ci / frontend (pull_request) Successful in 54s
ci / server (pull_request) Failing after 12m12s
ci / image (pull_request) Skipped
ci / e2e (pull_request) Skipped
- Traveler: each work-order line shrinks, then clips, to fit its own box; 18 pt gap between boxes
- Work orders tab: card text wraps inside the card, smaller work order, wider cards
- Packet tabs: Materials before Heat map
- Sessions: SESSION_DESK_MINUTES (60) for Admin and Clerical lock and sign-out; /me answers
  lock_minutes and the browser's idle lock follows it

Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-10-21 13:16:26 -06:00
spencermandClaude Fable 5.1 904437153d Phase 7: close, file, PDFs and prints
ci / frontend (push) Successful in 40s
ci / server (push) Successful in 10m56s
ci / image (push) Successful in 48s
ci / e2e (push) Successful in 2m44s
Clerical close and file: the VISUAL observed state beside the close confirm, a 409 with a second confirm when the
feed still shows work orders open, filing with a signature and the HMAC seal, the data book built on the server
and stored on the seal in the filing transaction, admin reopen keeping the broken seal with its data book.

Server PDFs with reportlab, pypdf and pypdfium2: the manufacturing data book page for page after the old build
(cover, index, drawings with VOID stamps, traceability and heat map rasters, weld maps and welding records, Q.C.
inspections, Q.C. and test documents, MTRs, record history), the job traveler with work order QR codes, the ITP
PDF filed automatically at sign-off, every print kind with the PRINTED COPY stamp, the controlled-copy stamp
signed with the seal key, PDF metadata, the traceability CSV with the formula guard, and the append-only
print_log with an audit row for every print and export (migration 0008).

Frontend: the close and file panel, the print menu and its entry points, the printed copies list on the History
tab, the ITP PDF buttons. Tests: server (close, file, reopen, seal, the builders, prints, CSV, stamps), frontend,
and the Playwright close and print scenarios. Docs updated; SECURITY closes M2, S6, S7 and S8.

Co-Authored-By: Claude Fable 5.1 <[email protected]>
2026-10-17 23:49:14 -06:00