2 Commits
Author SHA1 Message Date
spencermandClaude Fable 5.1 5a4174e0c2 Phase 5: Supervisor and Stall screens, weld map, heat table, clock and CO verification
ci / frontend (push) Successful in 34s
ci / server (push) Successful in 7m15s
ci / image (push) Successful in 39s
ci / e2e (push) Successful in 2m4s
The shop at parity with the old build. Supervisor screen (department chips, CO headline, numbers, Change orders
on hold, station grid with clocks and CO tags, boards) and Stall screen (station picker, hero, My packets,
Submitted). Shop steps on the packet page: assign with station, welder picker and stamp; pull back; Start, Pause,
Resume; Submit with a PIN signature and the missing steps as links; review with Send to Q.C., Return to station
and Skip Q.C. route; a lead's read-only review. Weld map (pdf.js viewer with pan, pinch, zoom, full screen; marks
with leader lines; weld sheet; weld record with field CAS; carried marks). Heat map (heat table placed, dragged,
sized, removed; legacy amber tags; borrowed heat map read-only). Checklist tab with templates from settings.
VOID stamps on voided pages. Change orders: CO-n labels, supervisor verify with signature, approval copies the
heat table to the new sheet and the BOM merge keeps the shop's values. Server clock of record with VISUAL ticket
hours beside it. Presence per packet over SSE. Migration 0006 (bfx, bfy, carried_from, checklist_templates).
New endpoints /api/shop/board, /api/shop/stations, /api/shop/stall, /api/departments/{code}/people.

Tests: policy oracle for every shop action, role and status; clock arithmetic; concurrent inserts; CO apply;
frontend geometry, heat table, clock, checklist, weld sheet, screens; seven Playwright scenarios. Docs updated.

Co-Authored-By: Claude Fable 5.1 <[email protected]>
2026-10-16 22:46:56 -06:00
spencermandClaude Fable 5.1 591fe90076 Phase 3: VISUAL feed and M-Files drawings in the worker
ci / frontend (push) Successful in 30s
ci / server (push) Successful in 4m12s
ci / image (push) Successful in 46s
ci / e2e (push) Successful in 1m24s
Migration 0004 (VISUAL and drawing caches, go-live ignored list, resource
map, job tables, order-derived columns with provenance; work order key
includes the operation sequence). The real worker on APScheduler with
settings re-read each fire, pause, run now, advisory locks, job_runs and a
heartbeat. The visual-feed job (five VisualKit reads, COPY and MERGE cache,
suspect-batch guard, the apply in one transaction: drafts, change orders,
retire-moved, work order gone, closed and cancelled observed, projects and
units from order links, auto-release) and the fingerprint. The drawing-lookup
job (queue, budget, download on version change, sha256 into assets, decision
table, staging for rev approval, drawing-origin change orders). Clerical From
VISUAL panel, flags, rev approval, hand uploads, change-order review; Admin
Feed settings and resource map. Synthetic fixture generator and a
fixture-driven worker in CI with a Playwright scenario. Docs updated.

Verified: 3249 server tests and 13 Playwright scenarios on the docker-1 CI
stack, 76 frontend tests, doctor at 0004; one feed and one drawing run
against VISUAL DEV and the vault from the developer machine (counts in the
changelog).

Co-Authored-By: Claude Fable 5.1 <[email protected]>
2026-10-16 14:45:38 -06:00