2 Commits
Author SHA1 Message Date
spencermandClaude Opus 5.5 a82e056b6a Phase 9: Admin completion, reconcile, notifications, integrity, backups
ci / frontend (pull_request) Successful in 1m11s
ci / server (pull_request) Successful in 12m2s
ci / image (pull_request) Skipped
ci / e2e (pull_request) Successful in 6m1s
Admin: Departments (name and stations; add shows the three groups IT must
create), Profiles (welder stamp, station limits, active) with a CSV import
that previews and applies only when clean, Checklists (weld and plain),
Security (session, lockout and rate-limit settings with bounds, alerts for
the last 24 hours, the integrity result), Access log with filters and a
guarded CSV, Who is in, Stamp check, Notifications, and the employeeID
flags. Every Admin change is audited.

Worker: ad-reconcile (nightly and on "refresh from AD now"), session-refresh
(15 minutes), integrity (seals, asset hashes, missing and orphan files, the
audit chain), backup-check, notify-send and notify-digest. Notifications
route per event type to AD groups, users, mailboxes or the department
Supervisor group, immediately or in a daily digest, over STARTTLS verified
against the PESCO CA, with dry run on the test stack.

Backups: scripts/backup/ps-backup.sh and ps-restore.sh with a systemd timer
at 02:00 America/Denver. Restore rehearsed on the test stack 2026-10-21.
CI: pip-audit and npm audit. pypdf 6.21.1 and certifi 2026.10.19.

Migration 0010. Closes the app part of I6, M3, O1, O2 and S3.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-10-21 18:27:09 -06:00
spencermandClaude Fable 5.1 00531cb329 Phase 6: Q.C. inspection, project folders, packet documents and the digital ITP
ci / frontend (push) Successful in 37s
ci / server (push) Successful in 9m18s
ci / image (push) Successful in 35s
ci / e2e (push) Successful in 2m17s
The Q.C. screen (KPIs, boards, project folders), the Q.C. tab on the packet
page (check items from the qc_check_items settings row, visual exam per weld,
NDE, hardness with the NACE label, notes), accept with a route and a
signature gated by qc_missing_empty, reject with a reason or an NCR number
closing the inspection into qc_history, Q.C. folder documents per project and
unit with superseding revisions, packet documents as a closed set with
take-out reasons, the digital ITP per unit from the frozen template (line
initials with CAS, unsign, N/A, customer codes, rejects with NCR, block
signatures, sign-off with the PDF hook, admin reopen, the ITP log), hold-point
warnings by department page group, the scoped policy check for unit and
project writes, migration 0007, tests, Playwright scenarios and docs.

Co-Authored-By: Claude Fable 5.1 <[email protected]>
2026-10-17 20:08:53 -06:00