The Q.C. screen (KPIs, boards, project folders), the Q.C. tab on the packet page (check items from the qc_check_items settings row, visual exam per weld, NDE, hardness with the NACE label, notes), accept with a route and a signature gated by qc_missing_empty, reject with a reason or an NCR number closing the inspection into qc_history, Q.C. folder documents per project and unit with superseding revisions, packet documents as a closed set with take-out reasons, the digital ITP per unit from the frozen template (line initials with CAS, unsign, N/A, customer codes, rejects with NCR, block signatures, sign-off with the PDF hook, admin reopen, the ITP log), hold-point warnings by department page group, the scoped policy check for unit and project writes, migration 0007, tests, Playwright scenarios and docs. Co-Authored-By: Claude Fable 5.1 <[email protected]>
3 lines
136 B
Python
3 lines
136 B
Python
"""PDF output: the data book, the traveler, the ITP, prints and stamps. Phase 7 builds them; phase 6 holds the ITP
|
|
filing hook only."""
|