# Packet Station paper fallback Status: planned, phase 10. This is a stub. See [PLAN.md](PLAN.md). ## Purpose What the shop does if the server is down, so work keeps moving (requirement O3). ## Before an outage What is kept ready on paper, and where. ## During an outage How each department records work on paper. ## After an outage How paper records are entered back into Packet Station, and who checks them.