Build Seth's changes C1 to C11 #54

Merged
spencerm merged 1 commits from seth-changes into main 2026-10-30 23:22:34 +00:00
Owner

Targets main. Rebased onto main after PR 53 (the docs that record C1 to C11) merged.

Issues applied (behaviour changes, built with tests and docs)

  • C1, issue 1: "over target" is decided by VISUAL ticket hours against the target. The timer stays as shown, and no ticket hours means not over. PM tables, KPI, CSV and PDF follow.
  • C2, issue 24: a Q.C. reject always needs a reason of 8 or more characters. An NCR number no longer stands in for it. After a reject with no NCR, the accept needs an NCR number (422 ncr_required). The accept stores it. NCR documents go into the data book.
  • C3, issue 25: FILE is blocked while the unit's ITP is not complete (itp_complete).
  • C4, issue 27: prints open the print dialog on the same page. pdf.js renders the stamped PDF, and no new tab opens. The CSP is unchanged.
  • C5, issue 31: FILE is blocked, not warned, while VISUAL shows a work order open, on both routes. The feed sets and clears vclosed_at on VISUAL packets, so the Clerical board moves the packet by itself. confirm_open_wos is gone. Hand packets keep the manual close.
  • C6, issue 8: the data book has no history section. The change-order table stays as a page in section 1.
  • C7, issue 18: new SHORT_APPROVE with a signature. The supervisor of the packet's department approves each short receipt. QC_ACCEPT and FILE need every short approved (shorts_approved). New append-only short_approvals table.
  • C8, issue 23: checklists are per department, in settings rows checklist:<code>. The department supervisor or Admin edits them on the new /checklists screen; Q.C. does not. A stage freezes its list at START, and stages already started are backfilled by migration 0011.
  • C9, issue 32: the stamp check is open to Admin, Q.C. and Clerical on /stamp-check and /api/stamp-verify. The /api/admin paths stay as aliases.
  • C10, issue 33: /api/pm/* and the PM screen are for PS-ProjectMgmt and Admin only.
  • C11, issue 36: the Stall screen has no station picker. GET /api/stall/mine lists the packets assigned to the welder, each at the stall the supervisor picked.

Confirmations recorded

  • Issue 9: keep the change order on a same-rev re-release (SethD, 2026-10-29). Recorded in PLAN Q10.

Questions asked on Gitea (not guessed)

  • Issue 4: what Presley's Production Planner is, where it lives, what a row holds, and how often it changes. The order rule stays as built.
  • Issue 31: a work order deleted from VISUAL while still open blocks filing for good. Should it count as closed after 2 runs, or should an Admin close it by hand with a reason? The Shipping-route question there still stands.

Choices to check

  • The stamp check and checklist saves need a password session. A PIN session gets password_session_required.
  • Packets in flight at deploy need supervisor approval of their existing short receipts, and an NCR at the next accept after a reject that had none.
  • The UI no longer edits the shared weld and plain default lists. /api/admin/checklists still does.

Verified

  • Locally: ruff, ruff format, mypy, tsc (tsconfig.app.json), eslint.
  • docker-1 CI compose stack: 6114 server tests, 366 frontend tests, 91 of 91 Playwright scenarios, and doctor at 0011_seth_changes.sql.

Migration 0011. Docs: PLAN, POLICY, SECURITY, SCHEMA, FEED, README, CHANGELOG.

🤖 Generated with Claude Code

Targets main. Rebased onto main after PR 53 (the docs that record C1 to C11) merged. ## Issues applied (behaviour changes, built with tests and docs) - **C1, issue 1:** "over target" is decided by VISUAL ticket hours against the target. The timer stays as shown, and no ticket hours means not over. PM tables, KPI, CSV and PDF follow. - **C2, issue 24:** a Q.C. reject always needs a reason of 8 or more characters. An NCR number no longer stands in for it. After a reject with no NCR, the accept needs an NCR number (422 `ncr_required`). The accept stores it. NCR documents go into the data book. - **C3, issue 25:** FILE is blocked while the unit's ITP is not complete (`itp_complete`). - **C4, issue 27:** prints open the print dialog on the same page. pdf.js renders the stamped PDF, and no new tab opens. The CSP is unchanged. - **C5, issue 31:** FILE is blocked, not warned, while VISUAL shows a work order open, on both routes. The feed sets and clears `vclosed_at` on VISUAL packets, so the Clerical board moves the packet by itself. `confirm_open_wos` is gone. Hand packets keep the manual close. - **C6, issue 8:** the data book has no history section. The change-order table stays as a page in section 1. - **C7, issue 18:** new `SHORT_APPROVE` with a signature. The supervisor of the packet's department approves each short receipt. QC_ACCEPT and FILE need every short approved (`shorts_approved`). New append-only `short_approvals` table. - **C8, issue 23:** checklists are per department, in settings rows `checklist:<code>`. The department supervisor or Admin edits them on the new `/checklists` screen; Q.C. does not. A stage freezes its list at START, and stages already started are backfilled by migration 0011. - **C9, issue 32:** the stamp check is open to Admin, Q.C. and Clerical on `/stamp-check` and `/api/stamp-verify`. The /api/admin paths stay as aliases. - **C10, issue 33:** `/api/pm/*` and the PM screen are for PS-ProjectMgmt and Admin only. - **C11, issue 36:** the Stall screen has no station picker. `GET /api/stall/mine` lists the packets assigned to the welder, each at the stall the supervisor picked. ## Confirmations recorded - **Issue 9:** keep the change order on a same-rev re-release (SethD, 2026-10-29). Recorded in PLAN Q10. ## Questions asked on Gitea (not guessed) - **Issue 4:** what Presley's Production Planner is, where it lives, what a row holds, and how often it changes. The order rule stays as built. - **Issue 31:** a work order deleted from VISUAL while still open blocks filing for good. Should it count as closed after 2 runs, or should an Admin close it by hand with a reason? The Shipping-route question there still stands. ## Choices to check - The stamp check and checklist saves need a password session. A PIN session gets `password_session_required`. - Packets in flight at deploy need supervisor approval of their existing short receipts, and an NCR at the next accept after a reject that had none. - The UI no longer edits the shared weld and plain default lists. `/api/admin/checklists` still does. ## Verified - Locally: ruff, ruff format, mypy, tsc (`tsconfig.app.json`), eslint. - docker-1 CI compose stack: 6114 server tests, 366 frontend tests, 91 of 91 Playwright scenarios, and doctor at `0011_seth_changes.sql`. Migration 0011. Docs: PLAN, POLICY, SECURITY, SCHEMA, FEED, README, CHANGELOG. 🤖 Generated with [Claude Code](https://claude.com/claude-code)
spencerm changed target branch from seth-answers-3 to main 2026-10-30 22:37:03 +00:00
spencerm added 1 commit 2026-10-30 22:37:03 +00:00
Build Seth's changes C1 to C11 (Gitea issues 1, 8, 18, 23, 24, 25, 27, 31, 32, 33, 36)
ci / server (pull_request) Successful in 12m48s
ci / frontend (pull_request) Successful in 54s
ci / image (pull_request) Skipped
ci / e2e (pull_request) Successful in 4m38s
70a97398f1
- C1 (issue 1): over target follows VISUAL ticket hours, not the timer.
- C2 (issue 24): a Q.C. reject always needs a reason; accept needs an NCR number after a reject without one.
- C3 (issue 25): an incomplete unit ITP blocks filing.
- C4 (issue 27): prints open the print dialog on the page, no new tab.
- C5 (issue 31): filing is blocked while VISUAL shows a work order open; the feed sets vclosed on VISUAL packets.
- C6 (issue 8): the data book leaves out the history pages.
- C7 (issue 18): the supervisor approves each received short; accept and filing wait for it.
- C8 (issue 23): per-department checklists, edited by the department supervisor or Admin, frozen at START.
- C9 (issue 32): Q.C. and Clerical may run the stamp check.
- C10 (issue 33): the PM screen and reports are for PS-ProjectMgmt and Admin only.
- C11 (issue 36): the Stall screen lists the packets assigned to the welder, at the supervisor's stall.

Migration 0011. Docs: PLAN (also issue 9 confirmed, issue 4 asked), POLICY, SECURITY, SCHEMA, FEED, README, CHANGELOG.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
spencerm force-pushed seth-changes from 1cd6688247 to 70a97398f1 2026-10-30 22:37:04 +00:00 Compare
spencerm merged commit 3147fedf24 into main 2026-10-30 23:22:34 +00:00
spencerm deleted branch seth-changes 2026-10-30 23:22:34 +00:00