PM reports readable by every signed-in role, every export logged #33

Closed
opened 2026-10-19 02:50:22 +00:00 by spencerm · 4 comments
Owner

Built as the default: any signed-in role may read the Project Management reports, not only PS-ProjectMgmt; every export is logged as report exported with scope and period.

To answer: keep or restrict.


Plan reference: Q39 in docs/PLAN.md (open questions). Answer here; the build takes the default until then.

**Built as the default:** any signed-in role may read the Project Management reports, not only PS-ProjectMgmt; every export is logged as report exported with scope and period. **To answer:** keep or restrict. --- Plan reference: Q39 in [docs/PLAN.md](https://gt.pescoinc.biz/spencerm/PacketStation/src/branch/main/docs/PLAN.md) (open questions). Answer here; the build takes the default until then.
spencerm added the phase 8decision: Seth labels 2026-10-19 02:50:22 +00:00
SethD was assigned by spencerm 2026-10-19 02:50:53 +00:00
Collaborator

I think we keep the project management reports separated. I want to keep the shops pages as clean and simple as possible.

I think we keep the project management reports separated. I want to keep the shops pages as clean and simple as possible.
Author
Owner

Thanks. The PM reports are already on their own screen (Project Management), separate from the shop boards, and the shop pages do not show them.

One detail: who may open the PM screen?

  1. Only PS-ProjectMgmt (and Admin).
  2. Anyone signed in, as today, but it is never shown on the shop screens or tablets.
Thanks. The PM reports are already on their own screen (Project Management), separate from the shop boards, and the shop pages do not show them. One detail: who may open the PM screen? 1. Only PS-ProjectMgmt (and Admin). 2. Anyone signed in, as today, but it is never shown on the shop screens or tablets.
Collaborator

lets go with just project management for now

lets go with just project management for now
Author
Owner

Noted: the Project Management screen and its reports are for PS-ProjectMgmt (and Admin) only. Recorded in docs/PLAN.md as change C10, to build in phase 10 (PR 53). Closing.

Noted: the Project Management screen and its reports are for PS-ProjectMgmt (and Admin) only. Recorded in docs/PLAN.md as change C10, to build in phase 10 (PR 53). Closing.
Sign in to join this conversation.
2 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: spencerm/PacketStation#33