Hold and short reasons as closed lists #17

Closed
opened 2026-10-19 02:50:17 +00:00 by spencerm · 4 comments
Owner

Built as the default: closed sets (hold: Waiting on material, Waiting on purchasing / PO, Question for engineering or clerical, Drawing / BOM problem, Other with a note; short: Not in stock, On order, Back-ordered, Damaged / rejected, Wrong part received, Needs cutting / prep, Other).

To answer: keep, add reasons, or allow free text.


Plan reference: Q20 in docs/PLAN.md (open questions). Answer here; the build takes the default until then.

**Built as the default:** closed sets (hold: Waiting on material, Waiting on purchasing / PO, Question for engineering or clerical, Drawing / BOM problem, Other with a note; short: Not in stock, On order, Back-ordered, Damaged / rejected, Wrong part received, Needs cutting / prep, Other). **To answer:** keep, add reasons, or allow free text. --- Plan reference: Q20 in [docs/PLAN.md](https://gt.pescoinc.biz/spencerm/PacketStation/src/branch/main/docs/PLAN.md) (open questions). Answer here; the build takes the default until then.
spencerm added the phase 4decision: Seth labels 2026-10-19 02:50:17 +00:00
SethD was assigned by spencerm 2026-10-19 02:50:53 +00:00
Collaborator

Please provide more information. Do these notes come from visual?

Please provide more information. Do these notes come from visual?
Author
Owner

More detail, since you asked. These do not come from VISUAL.

A hold is when someone stops a packet (for example the warehouse or the shop cannot go on). A short is when the warehouse cannot pull a BOM line. In both cases the person picks a reason in Packet Station from a fixed list:

  • Hold: Waiting on material, Waiting on purchasing / PO, Question for engineering or clerical, Drawing / BOM problem, Other (needs a note).
  • Short: Not in stock, On order, Back-ordered, Damaged / rejected, Wrong part received, Needs cutting / prep, Other.

A fixed list lets the boards and reports group by reason. The old build took any typed text.

The question: keep these lists, add reasons (which?), or allow free text?

More detail, since you asked. These do not come from VISUAL. A hold is when someone stops a packet (for example the warehouse or the shop cannot go on). A short is when the warehouse cannot pull a BOM line. In both cases the person picks a reason in Packet Station from a fixed list: - Hold: Waiting on material, Waiting on purchasing / PO, Question for engineering or clerical, Drawing / BOM problem, Other (needs a note). - Short: Not in stock, On order, Back-ordered, Damaged / rejected, Wrong part received, Needs cutting / prep, Other. A fixed list lets the boards and reports group by reason. The old build took any typed text. The question: keep these lists, add reasons (which?), or allow free text?
Collaborator

yes keep these lists

yes keep these lists
Author
Owner

Noted: the hold and short reason lists stay as they are. Recorded in docs/PLAN.md (PR 53). Closing.

Noted: the hold and short reason lists stay as they are. Recorded in docs/PLAN.md (PR 53). Closing.