Work-order-gone confirmation after 2 runs and the 10 percent suspect-batch guard #12

Closed
opened 2026-10-19 02:50:15 +00:00 by spencerm · 2 comments
Owner

A work order missing from VISUAL is flagged after two consecutive feed runs. A batch that lost more than 10 percent (and more than 5) of tracked work orders is applied without the gone step and marked degraded.

To answer: keep the two numbers or change them.


Plan reference: Q13 in docs/PLAN.md (open questions). Answer here; the build takes the default until then.

A work order missing from VISUAL is flagged after two consecutive feed runs. A batch that lost more than 10 percent (and more than 5) of tracked work orders is applied without the gone step and marked degraded. **To answer:** keep the two numbers or change them. --- Plan reference: Q13 in [docs/PLAN.md](https://gt.pescoinc.biz/spencerm/PacketStation/src/branch/main/docs/PLAN.md) (open questions). Answer here; the build takes the default until then.
spencerm added the phase 3decision: Seth labels 2026-10-19 02:50:15 +00:00
SethD was assigned by spencerm 2026-10-19 02:50:53 +00:00
Collaborator

your discretion on this

your discretion on this
Author
Owner

Applied in PR 50: docs/PLAN.md Q13 records that the two numbers stay as built (gone after 2 consecutive runs, the 10 percent suspect-batch guard). Closing.

Applied in PR 50: docs/PLAN.md Q13 records that the two numbers stay as built (gone after 2 consecutive runs, the 10 percent suspect-batch guard). Closing.