Phase 7: close, file, PDFs and prints
Clerical close and file: the VISUAL observed state beside the close confirm, a 409 with a second confirm when the feed still shows work orders open, filing with a signature and the HMAC seal, the data book built on the server and stored on the seal in the filing transaction, admin reopen keeping the broken seal with its data book. Server PDFs with reportlab, pypdf and pypdfium2: the manufacturing data book page for page after the old build (cover, index, drawings with VOID stamps, traceability and heat map rasters, weld maps and welding records, Q.C. inspections, Q.C. and test documents, MTRs, record history), the job traveler with work order QR codes, the ITP PDF filed automatically at sign-off, every print kind with the PRINTED COPY stamp, the controlled-copy stamp signed with the seal key, PDF metadata, the traceability CSV with the formula guard, and the append-only print_log with an audit row for every print and export (migration 0008). Frontend: the close and file panel, the print menu and its entry points, the printed copies list on the History tab, the ITP PDF buttons. Tests: server (close, file, reopen, seal, the builders, prints, CSV, stamps), frontend, and the Playwright close and print scenarios. Docs updated; SECURITY closes M2, S6, S7 and S8. Co-Authored-By: Claude Fable 5.1 <[email protected]>
This commit is contained in:
@@ -6,9 +6,9 @@ This repo is the rebuild of Packet Station as a server application: Docker Compo
|
||||
|
||||
## Status
|
||||
|
||||
**Rebuild in progress. Phase 6 done: Q.C. inspection, accept and reject, Q.C. project folders, packet documents and the digital ITP.**
|
||||
**Rebuild in progress. Phase 7 done: close in VISUAL, file with the HMAC seal and the data book, reopen, the server-built PDFs (data book, traveler, ITP), the traceability CSV, and stamped prints with the print log.**
|
||||
|
||||
People can sign in, set up projects and units, make hand drafts, attach a drawing, and send a packet to the warehouse, a department or Q.C. The worker reads released work orders from VISUAL on a schedule, makes and updates drafts, opens change orders on packets already in the shop, looks drawings up in M-Files and attaches them at the rev VISUAL calls. Clerical sees it all on the From VISUAL panel and in the Flagged and Changes to approve columns; Admin sets the feed up on the Feed tab. Warehouse works its task board (waiting, being pulled, on hold, pulled, released), pulls parts line by line with heat numbers, shorts, receipts and MTRs, and releases to the supervisor once every line is pulled or short and every pulled line has a heat. A supervisor assigns the packet to a station and a welder, the welder starts the clock, marks welds on the drawing, places the heat table, finishes the checklist and submits with a PIN signature, and the supervisor sends it to Q.C. or routes it to another department with the marks carried. Department supervisors verify change orders with a signature. Q.C. inspects the packet on its own tab (the check items, a visual result per weld, NDE, hardness, notes), accepts it to the data book, to Shipping or on to another department with a PIN signature, or rejects it back to the supervisor with a reason or an NCR number. Q.C. keeps project folders of documents per project and unit (ITP, WPS / PQR, procedures, certificates) where a new revision supersedes the old one and nothing is deleted, adds reports to a packet for the data book and takes them out with a reason, and works each unit's digital ITP from the Q.C. template through line initials, N/A, rejects with NCR numbers, section block signatures and a sign-off. Open hold and witness points show as a warning on the unit's packets. Every packet write goes through the server policy. The old build on `M:\Production\Packet Station` stays the live system until go-live. The new system starts empty; nothing is migrated from M:.
|
||||
People can sign in, set up projects and units, make hand drafts, attach a drawing, and send a packet to the warehouse, a department or Q.C. The worker reads released work orders from VISUAL on a schedule, makes and updates drafts, opens change orders on packets already in the shop, looks drawings up in M-Files and attaches them at the rev VISUAL calls. Clerical sees it all on the From VISUAL panel and in the Flagged and Changes to approve columns; Admin sets the feed up on the Feed tab. Warehouse works its task board (waiting, being pulled, on hold, pulled, released), pulls parts line by line with heat numbers, shorts, receipts and MTRs, and releases to the supervisor once every line is pulled or short and every pulled line has a heat. A supervisor assigns the packet to a station and a welder, the welder starts the clock, marks welds on the drawing, places the heat table, finishes the checklist and submits with a PIN signature, and the supervisor sends it to Q.C. or routes it to another department with the marks carried. Department supervisors verify change orders with a signature. Q.C. inspects the packet on its own tab (the check items, a visual result per weld, NDE, hardness, notes), accepts it to the data book, to Shipping or on to another department with a PIN signature, or rejects it back to the supervisor with a reason or an NCR number. Q.C. keeps project folders of documents per project and unit (ITP, WPS / PQR, procedures, certificates) where a new revision supersedes the old one and nothing is deleted, adds reports to a packet for the data book and takes them out with a reason, and works each unit's digital ITP from the Q.C. template through line initials, N/A, rejects with NCR numbers, section block signatures and a sign-off. Open hold and witness points show as a warning on the unit's packets. Clerical confirms the job closed in VISUAL (the feed's closed state and any open work orders shown beside it) and files the packet with a signature. Filing seals the packet with an HMAC and builds the manufacturing data book on the server, stored on the seal; filing past open work orders needs a second confirmation. IT can reopen a filed packet with a reason and a signature, which keeps the broken seal and its data book. Anyone who can open a packet can view or download the data book, the job traveler with the work order QR codes, the ITP PDF and the traceability CSV, and print a stamped copy of the traveler, the drawings with the heat or weld map, the drawings without markup, the VOID sheets, the data book or any document. Every copy carries a stamp signed with the seal key, and every print and export is logged. The ITP sign-off files the signed ITP PDF. Every packet write goes through the server policy. The old build on `M:\Production\Packet Station` stays the live system until go-live. The new system starts empty; nothing is migrated from M:.
|
||||
|
||||
| Area | Exists yet? |
|
||||
|---|---|
|
||||
@@ -20,7 +20,7 @@ People can sign in, set up projects and units, make hand drafts, attach a drawin
|
||||
| Warehouse screen, pull table, shorts and receipts, MTRs, release gate, upload kinds, optional ClamAV, storage alert | Yes (phase 4, verified in the CI stack on docker-1) |
|
||||
| Supervisor and Stall screens, weld map, heat table, station clock, change-order verification | Yes (phase 5, verified in the CI stack on docker-1) |
|
||||
| Q.C. screen, inspection, Q.C. folders, packet documents, digital ITP, hold-point warnings | Yes (phase 6, verified in the CI stack on docker-1) |
|
||||
| Close and file, PDFs | API only (phase 2); phase 7 |
|
||||
| Close and file, HMAC seal with the data book, reopen, data book, traveler and ITP PDFs, traceability CSV, prints and the print log | Yes (phase 7) |
|
||||
| Project Management, Admin, notifications, backups | No (phases 8 and 9) |
|
||||
| Regression bench and go-live | No (phase 10) |
|
||||
|
||||
@@ -87,6 +87,8 @@ Phase 3 adds the worker (`packetstation worker`: APScheduler, the `visual-feed`,
|
||||
|
||||
Phase 6 adds the Q.C. screen (`/qc`: numbers, boards, project folders), `GET /api/qc/home`, `GET /api/qc/folders` with the project and unit folder reads, `POST /api/qc/docs` (a new revision supersedes the old row), the per-key Q.C. endpoints under `/api/packets/{id}/qc`, document kinds as a closed set with take-out reasons, and the digital ITP under `/api/units/{id}/itp` and `/api/itps/{id}` (start, line sign and unsign, N/A, reject with NCR, block sign, sign-off, reopen, log). The ITP PDF filed on sign-off is a hook for phase 7. See [docs/POLICY.md](docs/POLICY.md) "Q.C. (phase 6)".
|
||||
|
||||
Phase 7 adds the close and file panel, `confirm_open_wos` on the file transition (409 `open_work_orders` without it), the data book built and stored on the seal at filing, `GET /api/packets/{id}/pdf/databook`, `GET /api/packets/{id}/pdf/traveler`, `GET /api/packets/{id}/export/traceability.csv`, `GET /api/packets/{id}/print/{kind}` (`traveler`, `map-h`, `map-w`, `clean`, `void`, `databook`, `doc`), `GET /api/packets/{id}/prints`, `GET /api/itps/{id}/pdf` and `GET /api/itps/{id}/print`, and the `print_log` table (migration 0008). The PDFs are built on the server with reportlab 5.0.1, pypdf and pypdfium2; the heat and weld map rasters use Pillow 13.0.0. Both are pinned in `pyproject.toml` and `server/requirements.txt`, and need no system package or font in the image. See [docs/POLICY.md](docs/POLICY.md) "Phase 7: close, file, PDFs and prints".
|
||||
|
||||
CI stack with the Samba domain controller and the Playwright scenario, on a Docker host:
|
||||
|
||||
```bash
|
||||
@@ -106,7 +108,7 @@ Server tests that need PostgreSQL run when `TEST_PG_SUPERUSER_URL` is set; the o
|
||||
- [docs/DEPLOY.md](docs/DEPLOY.md): host, stacks, secrets, NPM proxy host, doctor, backups.
|
||||
- [docs/FEED.md](docs/FEED.md): the worker, the VISUAL feed, the packet rules, the fingerprint, the drawing decision table, the flags and the feed settings.
|
||||
- [docs/POLICY.md](docs/POLICY.md): who may do what, the preconditions, the order of checks, concurrency, and the tightenings against the old build.
|
||||
- [docs/SCHEMA.md](docs/SCHEMA.md): the database schema (phases 1 to 3).
|
||||
- [docs/SCHEMA.md](docs/SCHEMA.md): the database schema (phases 1 to 7).
|
||||
- [docs/GO-LIVE.md](docs/GO-LIVE.md): go-live procedure (phase 10).
|
||||
- [docs/PAPER-FALLBACK.md](docs/PAPER-FALLBACK.md): what the shop does when the server is down (phase 10).
|
||||
- [CHANGELOG.md](CHANGELOG.md): what changed.
|
||||
|
||||