Build Seth's changes C1 to C11 (Gitea issues 1, 8, 18, 23, 24, 25, 27, 31, 32, 33, 36)
- C1 (issue 1): over target follows VISUAL ticket hours, not the timer. - C2 (issue 24): a Q.C. reject always needs a reason; accept needs an NCR number after a reject without one. - C3 (issue 25): an incomplete unit ITP blocks filing. - C4 (issue 27): prints open the print dialog on the page, no new tab. - C5 (issue 31): filing is blocked while VISUAL shows a work order open; the feed sets vclosed on VISUAL packets. - C6 (issue 8): the data book leaves out the history pages. - C7 (issue 18): the supervisor approves each received short; accept and filing wait for it. - C8 (issue 23): per-department checklists, edited by the department supervisor or Admin, frozen at START. - C9 (issue 32): Q.C. and Clerical may run the stamp check. - C10 (issue 33): the PM screen and reports are for PS-ProjectMgmt and Admin only. - C11 (issue 36): the Stall screen lists the packets assigned to the welder, at the supervisor's stall. Migration 0011. Docs: PLAN (also issue 9 confirmed, issue 4 asked), POLICY, SECURITY, SCHEMA, FEED, README, CHANGELOG. Co-Authored-By: Claude Opus 5.5 <[email protected]>
This commit is contained in:
@@ -0,0 +1,15 @@
|
||||
// The stamp check (change C9): Admin, Q.C. and Clerical check a printed or saved copy against the print log.
|
||||
// /api/stamp-verify and /api/stamp-verify/pdf take the same bodies and answer the same as the /api/admin aliases.
|
||||
import type { StampResult } from "./admin";
|
||||
import { api } from "./client";
|
||||
|
||||
export type { StampResult };
|
||||
|
||||
export const stampApi = {
|
||||
verify: (text: string) => api.post<StampResult>("/api/stamp-verify", { text }),
|
||||
verifyPdf: (file: File) => {
|
||||
const fd = new FormData();
|
||||
fd.append("file", file);
|
||||
return api.post<{ stamps: StampResult[] }>("/api/stamp-verify/pdf", fd);
|
||||
},
|
||||
};
|
||||
Reference in New Issue
Block a user