Phase 3: VISUAL feed and M-Files drawings in the worker
ci / frontend (push) Successful in 30s
ci / server (push) Successful in 4m12s
ci / image (push) Successful in 46s
ci / e2e (push) Successful in 1m24s

Migration 0004 (VISUAL and drawing caches, go-live ignored list, resource
map, job tables, order-derived columns with provenance; work order key
includes the operation sequence). The real worker on APScheduler with
settings re-read each fire, pause, run now, advisory locks, job_runs and a
heartbeat. The visual-feed job (five VisualKit reads, COPY and MERGE cache,
suspect-batch guard, the apply in one transaction: drafts, change orders,
retire-moved, work order gone, closed and cancelled observed, projects and
units from order links, auto-release) and the fingerprint. The drawing-lookup
job (queue, budget, download on version change, sha256 into assets, decision
table, staging for rev approval, drawing-origin change orders). Clerical From
VISUAL panel, flags, rev approval, hand uploads, change-order review; Admin
Feed settings and resource map. Synthetic fixture generator and a
fixture-driven worker in CI with a Playwright scenario. Docs updated.

Verified: 3249 server tests and 13 Playwright scenarios on the docker-1 CI
stack, 76 frontend tests, doctor at 0004; one feed and one drawing run
against VISUAL DEV and the vault from the developer machine (counts in the
changelog).

Co-Authored-By: Claude Fable 5.1 <[email protected]>
This commit is contained in:
2026-10-16 14:45:38 -06:00
co-authored by Claude Fable 5.1
parent 16950055e3
commit 591fe90076
103 changed files with 16063 additions and 151 deletions
+1 -1
View File
@@ -219,7 +219,7 @@ Need an answer before the named phase. Defaults apply if none arrives in time.
2. **PDFs on the server** (confirm before phase 7): reportlab + pypdf + pypdfium2. Default: yes.
3. **Frontend stack** (confirm before phase 1): TypeScript + React + Vite. Default: yes. Plain JavaScript would not be faster for parity: the old 7,000 lines are screen code that must be rewritten either way, and typed API models cut rework.
4. **PIN defaults** (confirm): 6 to 12 digits, five attempts, 10-hour shop session, device cookie. Genuinely open (Seth and Q.C., before phase 6): whether Q.C. accept and filing require the domain password even with a PIN set. Default: PIN is enough. IT: device certificate later.
5. **Several open orders on a project** (before phase 3): which order a packet shows. Proposed rule: the open order whose line's top job is the packet's work order base, else the newest open order, else the newest closed one; the packet shows "via base" or "via project" and Clerical can override. Needs Seth's view.
5. **Several open orders on a project** (before phase 3): which order a packet shows. Proposed rule: the open order whose line's top job is the packet's work order base, else the newest open order, else the newest closed one; the packet shows "via base" or "via project" and Clerical can override. Needs Seth's view. Phase 3 (2026-10-16) built the default in one function (`feed/orders.py`): a Clerical pin, else the base's own linked order, else the project order whose top job is the unit, else the project's first open order, else its newest; the source (`via`) is stored on the project and unit and shown on the project page, which lists every open order. Seth may change the rule later in that one place.
6. **VISUAL_ENCRYPT** (IT, before production): yes once vsql has a trusted certificate; `no` until then.
7. **Policy tightenings** listed under "Challenges" 1 to 3 (Seth, before phase 2).
8. **Repo location**: PacketStation2 as proposed, or another name.