Phase 4: Warehouse screen, pull table, shorts, MTRs and the upload pipeline
The Warehouse home with the numbers, the Open shorts table, the find bar and the five-column task board (waiting, being pulled, on hold, pulled, released in the last 3 days) with buttons, hold reasons and drag. Every role sees the warehouse stage on a packet as the WH pill and the line under it. The pull table on the Materials tab: Pulled with auto-start, issued, location, heat with Enter to the next line, shorts with receipts, N/A, MTR per line with a viewer. Send back to Clerical with a reason. Release to supervisor stays blocked until every line is pulled or short and every pulled line has a heat. Server: the heats_recorded precondition on WH_RELEASE, receive by custody, server-validated hold and short reasons, the old packet history texts, GET /api/warehouse/board, cards with the warehouse stage and pull counts. Uploads typed by content per kind (drawing, mtr, document, bom with XLSX and CSV), limits per kind, optional ClamAV behind the clamav compose profile, a storage quota alert on the new notification_events table (migration 0005) shown on the Admin Storage tab. Tests: every warehouse action as every role, the release gate, the short-receive exception, the heat pattern, upload sniffing and limits, the ClamAV path with a fake scanner, the quota alert; frontend board and pull table tests; Playwright scenarios for the board and the pull flow. Verified on docker-1 in the CI stack: 3557 server tests, 106 frontend tests, 17 Playwright scenarios. Docs updated; D5 closed. Co-Authored-By: Claude Fable 5.1 <[email protected]>
This commit is contained in:
+23
-5
@@ -2,7 +2,7 @@
|
||||
|
||||
This document is rewritten for the server build. The old browser build's security document is in the old repo (`C:\Users\spencerm\Coding\PacketStation\docs\SECURITY.md`). The design comes from [BRIEF.md](BRIEF.md) and [PLAN.md](PLAN.md).
|
||||
|
||||
Status: phase 3. The identity controls (sessions, PIN, rate limits, audit, Origin check, derived group map) and the policy controls (server policy on every write, workflow steps as compare-and-set, server-side validation and limits, IT edit reasons, the filed lock, the upload pipeline for drawings and documents) are built and tested. Phase 3 adds the worker controls (read-only VISUAL and M-Files reads, stack guard, advisory locks, redacted errors, audited system writes). No requirement ID closes in phase 3. Every other control names the phase that builds it.
|
||||
Status: phase 4. The identity controls (sessions, PIN, rate limits, audit, Origin check, derived group map) and the policy controls (server policy on every write, workflow steps as compare-and-set, server-side validation and limits, IT edit reasons, the filed lock, the upload pipeline for drawings and documents) are built and tested. Phase 3 adds the worker controls (read-only VISUAL and M-Files reads, stack guard, advisory locks, redacted errors, audited system writes). No requirement ID closes in phase 3. Phase 4 completes the upload pipeline (a kind per upload with its own types and limit, XLSX and CSV by content, the optional ClamAV scan, the assets volume quota alert) and adds the warehouse rules (the heat gate on release, closed hold and short reasons, receive by custody). Phase 4 closes D5. Every other control names the phase that builds it.
|
||||
|
||||
Contents:
|
||||
|
||||
@@ -29,7 +29,7 @@ The M: drive build had 20 layers of protection, most of them enforced in the bro
|
||||
| 11 | PIN sign-off (electronic signature) | Server-verified signature with the PIN or the domain password, stored with who, when, what, factor and a content hash. | 1 |
|
||||
| 12 | IT edit reasons | Kept. Admin writes need a reason and are marked as IT edits in the packet history and the audit. | 2 |
|
||||
| 13 | Screen lock | Server-enforced sessions. The browser reports idle and background state; the server records it and refuses an idle or locked session. Unlock is a step-up check on the server. | 1 |
|
||||
| 14 | Input and upload validation | On the server: field limits on every write, uploads typed by content, size limits, sanitised names. | 2, 4 |
|
||||
| 14 | Input and upload validation | On the server: field limits on every write, closed reason sets, uploads typed by content per kind (drawing PDF; MTR and document PDF, PNG or JPEG; BOM XLSX or CSV), a size limit per kind (25 MB, BOM 5 MB), sanitised names, an optional ClamAV scan before anything is stored, and a quota alert on the assets volume. Built. | 2, 4 |
|
||||
| 15 | Second-admin approval | Superseded. Roles come only from AD groups and the group-to-role map is derived, so there is nothing to grant in the app. | 1 |
|
||||
| 16 | Security alerts and automatic integrity check | Worker jobs and the Notifications tab (email through app-03). | 9 |
|
||||
| 17 | Controlled-copy stamp on data books | Applied to server-built PDFs and signed with the seal key. | 7 |
|
||||
@@ -74,14 +74,31 @@ The M: drive build had 20 layers of protection, most of them enforced in the bro
|
||||
- One policy in Python on the server (`server/packetstation/policy/`), pure functions with no I/O. Every write goes: session, policy, transition, validation, version check, packet log row, audit row, NOTIFY, in one transaction with the packet row locked. Nothing in the browser decides.
|
||||
- Every packet read returns `can: [...]`, `blocked: {...}` and `holder`, so the browser enables controls from the server's answer. The server re-checks on the write.
|
||||
- A workflow step taken twice is refused with 409 and the current state (compare-and-set on the expected status and department). Child rows carry a row version checked with If-Match. Weld, heat tag, page and change order numbers are assigned by the server under the lock.
|
||||
- Preconditions (heat map answered, drawing attached, BOM pulled or short, checklist complete, welds recorded, Q.C. items complete, closed in VISUAL before filing) run on the server and are never bypassed, Admin included.
|
||||
- Preconditions (heat map answered, drawing attached, BOM pulled or short, heats recorded on pulled lines, checklist complete, welds recorded, Q.C. items complete, closed in VISUAL before filing) run on the server and are never bypassed, Admin included.
|
||||
- Admin edits outside custody need an IT reason of at least 8 characters, recorded in the packet log and the audit row (`it_reason`). An Admin cannot write a filed packet except through the reopen action, which needs a reason and a signature and breaks the seal.
|
||||
- Signatures (PIN or domain password, verified in the same transaction) on submit, send to Q.C., Q.C. accept and reject, route, file, reopen, change order issue, approve, reject and verify, the revision approval and hand drawing uploads.
|
||||
- Input: every string is cleaned (control and invisible characters removed, NFC, trimmed) and cut to its field limit; heat numbers, stamps, project numbers and lots are checked against the old patterns; JSON bodies over 200 KB are refused.
|
||||
- Uploads: typed by content (PDF, PNG, JPEG), 25 MB limit read in chunks, sha256, stored by id under the assets volume, served only with a session and with `Content-Disposition` and `X-Content-Type-Options: nosniff`.
|
||||
- Uploads: typed by content (PDF, PNG, JPEG), 25 MB limit read in chunks, sha256, stored by id under the assets volume, served only with a session and with `Content-Disposition` and `X-Content-Type-Options: nosniff`. Phase 4 completes it (see "Uploads and storage").
|
||||
- The filed lock: a filed packet accepts only the data book date and the Admin reopen. Filing writes an HMAC-SHA256 seal with the server seal key; a reopen keeps the old seal with who broke it and why.
|
||||
- Details in [POLICY.md](POLICY.md).
|
||||
|
||||
### Uploads and storage (phase 4)
|
||||
|
||||
- Every upload names a kind (`purpose`): drawing, mtr, document or bom. No purpose means document. An unknown kind is 422.
|
||||
- The type is read from the content, never from the file name or the browser's type. A drawing is a PDF. An MTR or a document is a PDF, PNG or JPEG. A BOM is an XLSX or a CSV. A wrong type for the kind is 415 `unsupported_type` with a message that names the allowed types.
|
||||
- An XLSX must be a zip that lists `[Content_Types].xml` and `xl/workbook.xml`; a plain zip is refused. A CSV has no magic, so it is accepted only as a BOM, and only when its first 64 KB decode as UTF-8 with no NUL and no control character other than tab, CR and LF.
|
||||
- Limits per kind: 25 MB (`upload_max_bytes`) for drawing, mtr and document, 5 MB (`upload_max_bytes_bom`) for a BOM. The Content-Length is checked first, then the bytes as they are read. Over the limit is 413 `too_large`.
|
||||
- XLSX and CSV are always served as an attachment, never inline. Every blob keeps `Content-Disposition` and `nosniff`.
|
||||
- Optional ClamAV (requirement D5). When `CLAMAV_HOST` is set, every upload and every file the worker stores (drawings from M-Files) is streamed to clamd with `zINSTREAM` after it is read in full and before it is deduped or placed. A hit is 422 `infected`, nothing is stored, and an `asset.rejected` audit row keeps the signature, size and type. A scanner that cannot be reached refuses the upload with 503 `scan_unavailable` (fail closed). With `CLAMAV_HOST` empty there is no scan.
|
||||
- Quota alert. After every stored file and in the housekeeping job, the assets volume usage is checked against `ASSETS_QUOTA_WARN_PCT` (85 by default). Over it, one open `notification_events` row of kind `assets_quota` is written and audited as `storage.quota_warning`. Back under, the row is resolved. A failed check never fails an upload. Admin sees usage, the alert and the scanner on the Storage tab and can acknowledge an alert (`alert.acknowledged`). Phase 9 sends the email.
|
||||
|
||||
### Warehouse rules (phase 4)
|
||||
|
||||
- Release to the supervisor is refused on the server until every line is pulled or short and every pulled line that issued pieces has a heat (N/A and sub-assembly lines excepted). Heat numbers are checked against the old pattern.
|
||||
- Hold reasons and short reasons are closed sets on the server.
|
||||
- Short receipts go to the warehouse in any status but filed, or to the holder of the packet through the BOM edit rule. Nobody else.
|
||||
- An MTR on a line must be a PDF, PNG or JPEG asset.
|
||||
|
||||
### Worker (phase 3)
|
||||
|
||||
- The worker publishes no port and joins no proxy network. It reaches out to VISUAL and M-Files only; nothing reaches in. Admin and Clerical reach it only through rows in PostgreSQL (`job_requests`, the `feed` settings row) and NOTIFY.
|
||||
@@ -99,6 +116,7 @@ The M: drive build had 20 layers of protection, most of them enforced in the bro
|
||||
- `packetstation doctor` checks that an audit UPDATE fails.
|
||||
- Every identity event is a row: sign-in, failed sign-in with a reason, sign-out, lock, unlock, session ended, PIN set, disabled or cleared, device registered or revoked, signature, AD refresh. Each carries the user, session, roles, client address and a small detail object, never a secret.
|
||||
- `signin_attempts` and `signatures` are append-only in the same way.
|
||||
- Phase 4 audit actions: `asset.rejected` (an upload the virus scan refused, with `reason`, `signature`, `size` and `mime`), `storage.quota_warning` (the assets volume went over the warning threshold, with the usage) and `alert.acknowledged` (an Admin acknowledged an open alert). Every warehouse write is a `packet.<action>` row with `detail.item`, the warehouse stage before and after, and `detail.qty` on short writes.
|
||||
|
||||
### CI identity fixtures (phase 1)
|
||||
|
||||
@@ -142,7 +160,7 @@ The IDs come from Part 3 of the old SECURITY.md. The status follows the approved
|
||||
| A4 | Closed, phase 0 |
|
||||
| D1, D2, D4 | Deferred (envelope encryption, Key Vault) |
|
||||
| D3 | IT's (host disk encryption on docker-1) |
|
||||
| D5 | Closed, phase 4 (optional ClamAV) |
|
||||
| D5 | Closed, phase 4 (optional ClamAV: a `clamav` compose profile; when `CLAMAV_HOST` is set every upload and every stored drawing is scanned before it is kept, a hit is refused and audited, and an unreachable scanner refuses uploads; off when the host is not set) |
|
||||
| D6, D7 | Deferred (retention period and customer copy need a decision from Seth and Q.C.) |
|
||||
| M1 | Closed, phase 2 (append-only audit and packet log written only by the server; every packet write carries both) |
|
||||
| M2 | Closed, phase 7 |
|
||||
|
||||