Phase 6: Q.C. inspection, project folders, packet documents and the digital ITP
The Q.C. screen (KPIs, boards, project folders), the Q.C. tab on the packet page (check items from the qc_check_items settings row, visual exam per weld, NDE, hardness with the NACE label, notes), accept with a route and a signature gated by qc_missing_empty, reject with a reason or an NCR number closing the inspection into qc_history, Q.C. folder documents per project and unit with superseding revisions, packet documents as a closed set with take-out reasons, the digital ITP per unit from the frozen template (line initials with CAS, unsign, N/A, customer codes, rejects with NCR, block signatures, sign-off with the PDF hook, admin reopen, the ITP log), hold-point warnings by department page group, the scoped policy check for unit and project writes, migration 0007, tests, Playwright scenarios and docs. Co-Authored-By: Claude Fable 5.1 <[email protected]>
This commit is contained in:
@@ -52,6 +52,12 @@ LIMITS: dict[str, int] = {
|
||||
"filler": 40,
|
||||
"preheat": 40,
|
||||
"weld_text": 40,
|
||||
"doc_note": 300,
|
||||
"qc_doc_title": 140,
|
||||
"qc_doc_rev": 12,
|
||||
"qc_doc_note": 600,
|
||||
"ncr": 40,
|
||||
"itp_field": 120,
|
||||
}
|
||||
REASON_MIN = 8
|
||||
MAX_BODY_BYTES = 200_000
|
||||
|
||||
Reference in New Issue
Block a user