Phase 6: Q.C. inspection, project folders, packet documents and the digital ITP
ci / frontend (push) Successful in 37s
ci / server (push) Successful in 9m18s
ci / image (push) Successful in 35s
ci / e2e (push) Successful in 2m17s

The Q.C. screen (KPIs, boards, project folders), the Q.C. tab on the packet
page (check items from the qc_check_items settings row, visual exam per weld,
NDE, hardness with the NACE label, notes), accept with a route and a
signature gated by qc_missing_empty, reject with a reason or an NCR number
closing the inspection into qc_history, Q.C. folder documents per project and
unit with superseding revisions, packet documents as a closed set with
take-out reasons, the digital ITP per unit from the frozen template (line
initials with CAS, unsign, N/A, customer codes, rejects with NCR, block
signatures, sign-off with the PDF hook, admin reopen, the ITP log), hold-point
warnings by department page group, the scoped policy check for unit and
project writes, migration 0007, tests, Playwright scenarios and docs.

Co-Authored-By: Claude Fable 5.1 <[email protected]>
This commit is contained in:
2026-10-17 20:08:53 -06:00
co-authored by Claude Fable 5.1
parent 8bb1f7ae4d
commit 00531cb329
64 changed files with 11715 additions and 260 deletions
+6 -3
View File
@@ -6,9 +6,9 @@ This repo is the rebuild of Packet Station as a server application: Docker Compo
## Status
**Rebuild in progress. Phase 5 done: the Supervisor and Stall screens, the weld map, the heat table, the station clock and change-order verification.**
**Rebuild in progress. Phase 6 done: Q.C. inspection, accept and reject, Q.C. project folders, packet documents and the digital ITP.**
People can sign in, set up projects and units, make hand drafts, attach a drawing, and send a packet to the warehouse, a department or Q.C. The worker reads released work orders from VISUAL on a schedule, makes and updates drafts, opens change orders on packets already in the shop, looks drawings up in M-Files and attaches them at the rev VISUAL calls. Clerical sees it all on the From VISUAL panel and in the Flagged and Changes to approve columns; Admin sets the feed up on the Feed tab. Warehouse works its task board (waiting, being pulled, on hold, pulled, released), pulls parts line by line with heat numbers, shorts, receipts and MTRs, and releases to the supervisor once every line is pulled or short and every pulled line has a heat. A supervisor assigns the packet to a station and a welder, the welder starts the clock, marks welds on the drawing, places the heat table, finishes the checklist and submits with a PIN signature, and the supervisor sends it to Q.C. or routes it to another department with the marks carried. Department supervisors verify change orders with a signature. Every packet write goes through the server policy. The Q.C. screen is still a placeholder; its API exists. The old build on `M:\Production\Packet Station` stays the live system until go-live. The new system starts empty; nothing is migrated from M:.
People can sign in, set up projects and units, make hand drafts, attach a drawing, and send a packet to the warehouse, a department or Q.C. The worker reads released work orders from VISUAL on a schedule, makes and updates drafts, opens change orders on packets already in the shop, looks drawings up in M-Files and attaches them at the rev VISUAL calls. Clerical sees it all on the From VISUAL panel and in the Flagged and Changes to approve columns; Admin sets the feed up on the Feed tab. Warehouse works its task board (waiting, being pulled, on hold, pulled, released), pulls parts line by line with heat numbers, shorts, receipts and MTRs, and releases to the supervisor once every line is pulled or short and every pulled line has a heat. A supervisor assigns the packet to a station and a welder, the welder starts the clock, marks welds on the drawing, places the heat table, finishes the checklist and submits with a PIN signature, and the supervisor sends it to Q.C. or routes it to another department with the marks carried. Department supervisors verify change orders with a signature. Q.C. inspects the packet on its own tab (the check items, a visual result per weld, NDE, hardness, notes), accepts it to the data book, to Shipping or on to another department with a PIN signature, or rejects it back to the supervisor with a reason or an NCR number. Q.C. keeps project folders of documents per project and unit (ITP, WPS / PQR, procedures, certificates) where a new revision supersedes the old one and nothing is deleted, adds reports to a packet for the data book and takes them out with a reason, and works each unit's digital ITP from the Q.C. template through line initials, N/A, rejects with NCR numbers, section block signatures and a sign-off. Open hold and witness points show as a warning on the unit's packets. Every packet write goes through the server policy. The old build on `M:\Production\Packet Station` stays the live system until go-live. The new system starts empty; nothing is migrated from M:.
| Area | Exists yet? |
|---|---|
@@ -19,7 +19,8 @@ People can sign in, set up projects and units, make hand drafts, attach a drawin
| VISUAL feed, M-Files drawings, change orders from the feed, From VISUAL panel, Admin Feed tab and resource map | Yes (phase 3, run once against VISUAL DEV and the vault from a developer machine; fixture-driven in CI) |
| Warehouse screen, pull table, shorts and receipts, MTRs, release gate, upload kinds, optional ClamAV, storage alert | Yes (phase 4, verified in the CI stack on docker-1) |
| Supervisor and Stall screens, weld map, heat table, station clock, change-order verification | Yes (phase 5, verified in the CI stack on docker-1) |
| Q.C., close and file, PDFs | API only (phase 2); screens in phases 6 and 7 |
| Q.C. screen, inspection, Q.C. folders, packet documents, digital ITP, hold-point warnings | Yes (phase 6, verified in the CI stack on docker-1) |
| Close and file, PDFs | API only (phase 2); phase 7 |
| Project Management, Admin, notifications, backups | No (phases 8 and 9) |
| Regression bench and go-live | No (phase 10) |
@@ -84,6 +85,8 @@ The `packetstation` command has `doctor`, `migrate`, `app`, `worker`, `job run <
Phase 3 adds the worker (`packetstation worker`: APScheduler, the `visual-feed`, `drawing-lookup` and `housekeeping` jobs, settings re-read on every fire, run now through `job_requests`), the VISUAL and drawing cache tables (migration 0004), `/api/feed/*`, `/api/jobs/*`, `/api/admin/feed/*`, rev approval and hand uploads under `/api/packets/{id}`, and the synthetic fixture generator (`python -m tests.fixtures.generator --out DIR`) that CI feeds the worker with. See [docs/FEED.md](docs/FEED.md).
Phase 6 adds the Q.C. screen (`/qc`: numbers, boards, project folders), `GET /api/qc/home`, `GET /api/qc/folders` with the project and unit folder reads, `POST /api/qc/docs` (a new revision supersedes the old row), the per-key Q.C. endpoints under `/api/packets/{id}/qc`, document kinds as a closed set with take-out reasons, and the digital ITP under `/api/units/{id}/itp` and `/api/itps/{id}` (start, line sign and unsign, N/A, reject with NCR, block sign, sign-off, reopen, log). The ITP PDF filed on sign-off is a hook for phase 7. See [docs/POLICY.md](docs/POLICY.md) "Q.C. (phase 6)".
CI stack with the Samba domain controller and the Playwright scenario, on a Docker host:
```bash