20 lines
419 B
Markdown
20 lines
419 B
Markdown
# Packet Station paper fallback
|
|||
|
|
|
||
|
|
Status: planned, phase 10. This is a stub. See [PLAN.md](PLAN.md).
|
||
|
|
|
||
|
|
## Purpose
|
||
|
|
|
||
|
|
What the shop does if the server is down, so work keeps moving (requirement O3).
|
||
|
|
|
||
|
|
## Before an outage
|
||
|
|
|
||
|
|
What is kept ready on paper, and where.
|
||
|
|
|
||
|
|
## During an outage
|
||
|
|
|
||
|
|
How each department records work on paper.
|
||
|
|
|
||
|
|
## After an outage
|
||
|
|
|
||
|
|
How paper records are entered back into Packet Station, and who checks them.
|